Газовый котел unical eve 05 инструкция

  1. Manuals
  2. Brands
  3. Unical Manuals
  4. Boiler
  5. EVE 05 CTN 24 F

Manuals and User Guides for Unical EVE 05 CTN 24 F. We have 1 Unical EVE 05 CTN 24 F manual available for free PDF download: Installation, Use And Maintenance Manual

Unical EVE 05 CTN 24 F Installation, Use And Maintenance Manual

Unical EVE 05 CTN 24 F Installation, Use And Maintenance Manual (36 pages)

Brand: Unical
|
Category: Boiler
|
Size: 1.36 MB

Table of Contents
  • Summer Operation

    4

  • Winter Operation

    4

  • Table of Contents

    7

  • 1 Technical Features and Dimensions

    8

    • Technical Features

      8

    • Dimensions

      8

    • Hydraulic Circuit

      9

  • 2 Directions for

    13

    • Installers

      13

    • Installation

      13

      • Packing

        13

      • Positioning the Boiler

        14

      • Assembling the Boiler

        15

      • Ventilation

        15

      • Flue Gas Discharge System

        15

      • Positioning of Terminals for Type C Boilers

        18

      • Flue Gas Discharge and Air Suction with Separate

        21

      • Connection to the Gas Mains

        24

      • Hydraulic Connection

        24

      • Electrical Connection

        26

      • Jumper Location

        26

    • Wiring Diagram

      27

    • Filling the System

      28

    • Starting the Boiler

      28

    • Adjusting the Burner

      29

    • Modification of Other Gases

      30

    • Failure Code

      31

  • 3 Users’ Instruction

    33

    • Control Panel

      33

    • Switching On/Off

      34

    • Antifrost Protection

      35

    • Important Suggestion and Notes

      35

Advertisement

Advertisement

Related Products

  • Unical EVE 05 CTN 24

  • Unical EVE 05 CTFS 24 F

  • Unical EVE 05 CTFS 24

  • Unical KONe C 28

  • Unical CoR Series

  • Unical CoR C24

  • Unical !DEA CS 24 el

  • Unical !DEA CS 24 PLUS el

  • Unical !DEA CS 28 el

  • Unical !DEA CS 32 PLUS el

Unical Categories

Boiler

Air Conditioner
Air Conditioner

Water Heater

Heat Pump

Remote Control

More Unical Manuals

Report abuse

Libble takes abuse of its services very seriously. We’re committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we’ll investigate it and take the appropriate action. We’ll get back to you only if we require additional details or have more information to share.

Product:

Get your user manual by e-mail

Enter your email address to receive the manual of Unical EVE 05 CTFS 24 F in the language / languages: English as an attachment in your email.

The manual is 1,36 mb in size.

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

Service info

Burner in operation

This symbol indicates that the

burner is in operation, in CH or

DHW mode.

CH mode operation

This symbol is present if there is

a CH demand. If a contemporary

DHW drawing is done, this sym-

bol disappears.

DHW mode operation

This symbol is present if there is

a DHW drawing.

Lockout symbol

The function of this symbol is to

indicate the burner safety inter-

vention, due to:

— lack of gas

— not detected ignition

In the first case, no ignition oc-

curs: verify that the gas feeding

is present.

In the second case, check the

ignition electrode and the con-

nections to the main PCB.

3.2

SWITCHING

ON / OFF

SWITCHING ON

B

For the operation of the boiler in WINTER

mode, the knob «B» pointer must be positio-

ned in the grey range indicated by the arrow

on the figure shown above. The limit of the

arrow corresponds to the minimum and

maximum temperature values of 45°C and

78°C.

Note: If a room thermostat is fitted, set it

to the desired temperature.

34

CHIMNEY

SWEEPER AT

THE MAXIMUM

CAPACITY

CHIMNEY

SWEEPER AT

THE MINIMUM

CAPACITY

For the operation of the boiler in SUMMER

mode, only for domestic hot water production,

the knob »B» reference has to be positioned

on the SUN

MAX

value has to be adjusted using the knob »C».

C

MIN

Reset push button

In order to restart the boiler

when the lockout symbol is

displayed, it will be necessary to

push this button.

Chimney sweeper button

This push button, depressed for

3 seconds, activates the

chimney sweeper function: the

boiler will be forced to operate at

the maximum (or minimum)

capacity, in order to allow the

gas valve adjustment and the

smoke analysis.

When this function is activated,

by pushing this button once, the

boiler will operate at maximum

capacity. The radiator symbol will

be blinking, while the flame

symbol will be permanently

lighted.

°C

By pushing again the button

(when the boiler is set to the

maximum capacity), the boiler will

operate at minimum capacity. The

radiator and the flame symbols,

both, will be blinking.

°C

In order to clear this function

switch OFF and ON the boiler; if

not, the boiler will revert to nor-

mal operation after 15 minutes.

B

MAX

and the D.H.W. temperature

D.H.W. temperature adjust-

ment range for the models:

EVE 05 CTN/CTFS

MAX

Failure symbol

The symbol is displayed when the

boiler detects an operation anomaly

or when the boiler is in lock-out for

a permanent failure. The code iden-

tifying the cause is displayed

instead of the boiler temperature by

pushing the reset push-button.

SWITCHING OFF

Put the «B» knob on the SUN position and the

«C» knob to the minimum.

Switch OFF the boiler by acting on the

external main switch, provided the antifrost

protection is not required; otherwise go to 3.3.

Shut OFF the gas cock upstream

the boiler in case a prolonged inac-

tivity period of the boiler is ex-

pected.

  • 18, 18 Installation info fig. 12 Pursuant to the directives of regulations in force, discharge of forced draught boilers can 2.2.7 — POSITIONING OF TERMINALS FOR TYPE ‘’C’’ BOILERS either take place through the roof or directly outwards the room they are installed in. The following distances shall be considered for terminals proper positioning: POSITIONING OF TERMINALS FOR «FORCE…

  • 16, 16 Installation info fig. 10 2 Ø min. Slope min. 3% Ø 1,5 m min. 2 Ø 1 m max. 1,5 m min. 2 Ø Ø Slope min. 3% 1 m max. 2 Ø min. > 3 Ø > 3 Ø fig. 11 210 Ø 130 180 Direct emission into the atmosphere Natural draught boilers can discharge combustion products directly into the atmo- sphere using a duct, which goes through the outside walls of the building, connected t…

  • 36, AG S.P.A. 46033 casteldario — mantova — italia — tel. 0376/57001 (r.a.) — telefax 0376/660556 The Unical declines every responsibility for the possible inaccuracies if owed to errors of transcript or press. Also reserves the right to bring those changes that it will hold necessary to it own products or profits, without jeopardizing its essential characteristics.

  • 34, 34 Service info Reset push button In order to restart the boiler when the lockout symbol is displayed, it will be necessary to push this button. Chimney sweeper button This push button, depressed for 3 seconds, activates the chimney sweeper function: the boiler will be forced to operate at the maximum (or minimum) capacity, in order to allow the gas valve ad…

  • 21, 21 Installation info fig. 17 152 100 95 Up to ΔΔ ΔΔ Δ P = 20 Pa Rubber foam gasket Diaphragm Ø 42 fig. 18 It is not allowed to position the 2 termi- nals in opposite walls, see configuration type C52. DIMENSIONS FOR CONNECTION TO COAXIAL FLUE GAS DUCTS 2.2.10 — FLUE GAS DISCHARGE AND AIR SUCTION WITH DUAL DUCTS WITH 80 mm DIAMETER NB: The maximum allowable pressure loss, ir…

  • 24, 24 Installation info 2.2.13 — HYDRAULIC CONNECTION Before installing the boiler we recommend that the system be cleaned to remove any impuri- ties which could originate from components and which could risk damaging the circulating pump and heat exchanger. Note: The use of solvents could damage the components of the heating cir- cuit. Basing on the feeding water hardness…

  • 2, 2 General info IMPORTANT This INSTRUCTION MANUAL, which is an integral and indispensable part of the product, must be handed over to the user by the plumbers and must be kept in a safe place for future reference. The manual must be handed over with the boiler should it be sold or transferred. This boiler must be used for the purposes for which it has been designed…

  • 17, 17 Installation info 2.2.6 — SMOKE DISCARGE AND AIR SUCTION DUCT CONFIGURATION C12, C32, C42, C52, C62, C82 — B22 type C12 type C32 type C52 type C82 type C62 type C42 SEPARATE type B22 C12 Boiler designed for connection to hori- zontal exhaust and suction terminals directly into the atmosphere using coaxial or dual ducts. The distance between the air intake duct and the flue gas outlet duct must …

  • 3, 3 Users easy guide REMEMBER: • Periodically check the water pressure into the boiler. • Ascertain to be able to turn OFF the appliance in case of emergency (power, gas and water supply). • Make sure to be familiar with the switching ON and OFF and with the temperature adjusting knobs. • The user is not allowed to remove the casing and get access to the internal …

  • 22, 22 Installation info fig. 19 fig. 20 DIMENSIONS FOR CONNECTION THE AIR INTAKE AND THE FLUE GAS DISCHARGE WITH DUAL DUCTS _ > 500 Hmin. = 150 mm CONFIGURATIONS FOR SEPARATE PIPES (SUCTION AND OUTLET) Ø 80 Example N.1 Primary air suction from perimeter wall and flue gas discharge on roof. Maximum allowable pressure loss: 50 Pa 87 120 152 Ø 80 123 90 Example N.1

  • 30, 30 Adjustment info fig. 30 1 EVE 05 CTN 24 F — EVE 05 CTN 24 — EVE 05 RTN 24 Tipe of gas Output min. — max (kW) Input min. — max (kW) Supply pressure (mbar) No. of Nozzles Ø Diaphragme (mm) Natural gas(G20) Propan (G31) 10,17 — 24,0 10,17 — 24,0 11,5 — 26,5 11,5 — 26,5 20 37 12 12 Ø Nozzles (mm) — — EVE 05 CTFS 24 F — EVE 05 CTFS 24 — EVE 05 RTFS 24 9,9 — 24,2 9,9 — 24,2 11,5 — 26,5 11,5 — 2…

  • 9, 9 Installation info fig. 3 EVE 05 CTN 24 F EVE 05 CTFS 24 F fig. 2 CF G R 1 M 3 4 2 5 6 7 9 10 11 8 12 13 14 15 16 17 18 19 20 21 1 3 4 2 5 6 7 8 9 10 11 12 13 CF G 14 15 16 17 18 19 20 21 22 23 RM 1.3 — HYDRAULIC CIRCUIT 1 Flow switch — Cold water filter 2 D.H.W. flow restrictor 3 Gas valve 4 D.H.W. temperature sensor 5 Burner nozzles 6 Ionisation/Ignition electrode 7 Burner 8 Bithermal hea…

  • 25, 25 Installation info fig. 23 EVE 05 RTN 24 — EVE 05 RTFS 24 EVE 05 CTN 24 F — EVE 05 CTFS 24 F EVE 05 CTN 24 — EVE 05 CTFS 24 6,2 6,0 5,8 5,6 5,4 5,2 5,0 4,8 4,6 4,4 4,2 4,0 3,8 3,6 3,4 3,2 3,0 2,8 2,6 2,4 2,2 2,0 1,8 1,6 1,4 1,2 1,0 0,8 0,6 0,4 0,2 0 0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1200 1250 1300 1350 1400 V1 V2 V 3 6,2 6,0 5,8 5,…

Download or browse on-line these Installation, Use And Maintenance Manual for Unical EVE 05 RTN 24 Boiler.

Summary of Contents:

[Page 1] Unical EVE 05 RTN 24

EVE 05 RTN 24 — RTFS 24 CTN 24 F — CTFS 24 F CTN 24 — CTFS 24 00332243 — 3 rd edition — 10/2010 INSTALLATION USE AND MAINTENANCE English

[Page 2] Unical EVE 05 RTN 24

2 General info IMPORTANT This INSTRUCTION MANUAL, which is an integral and indispensable part of the product, must be handed over to the user by the plumbers and must be kept in a safe place for future reference. The manual must be handed over with t…

[Page 3] Unical EVE 05 RTN 24

3 Users easy guide REMEMBER: • Periodically check the water pressure into the boiler. • Ascertain to be able to turn OFF the appliance in case of emergency (power, gas and water supply). • Make sure to be familiar with the switching ON and OFF …

[Page 4] Unical EVE 05 RTN 24

4 Users easy guide Reset push button Central heating temperature adjusting knob Domestic Hot Water temperature adjusting knob Manometer CONTROLS HOW TO START THE BOILER — Swicth ON the boiler through the external switch. — Check if a room thermostat …

[Page 5] Unical EVE 05 RTN 24

5 Users easy guide HOW TO SET THE WATER PRESSURE INTO THE SYSTEM The water pressure into the system has to be checked periodically, in order to be sure of the boiler correct operation. The manometer arrow has to be above 0.8/1 bar when the boiler is …

[Page 6] Unical EVE 05 RTN 24

6 General info DATA PLATE LEGEND: 1 = CE Surveillance notify body 2= Boiler type 3=Boiler model 4=Number of stars (Directive 92/42/CEE) 5=(S.N°) Serial number 6=P.I.N. code 7=Approved fluing configurations 8=(N0x) N0x class A = Central Heating circu…

[Page 7] Unical EVE 05 RTN 24

7 General info 1 2 3 For your own safety, observe these safety instructions.: PLEASE NOTE: User tip for the optimum utilisation and setting of the control(s) plus useful information. WARNING from risk of electric shock. WARNING Identifies potentially…

[Page 8] Unical EVE 05 RTN 24

8 Installation info 1 TECHNICAL FEATURES AND DIMENSIONS • Pump anti-jamming function; • Pump over run function; • High limit thermostat (95°C); • Three-speed circulating pump; • Expansion vessel; • Automatic air vent; • C.H. system wat…

[Page 9] Unical EVE 05 RTN 24

9 Installation info fig. 3 EVE 05 CTN 24 F EVE 05 CTFS 24 F fig. 2 CF G R 1 M 3 4 2 5 6 7 9 10 11 8 12 13 14 15 16 17 18 19 20 21 1 3 4 2 5 6 7 8 9 10 11 12 13 CF G 14 15 16 17 18 19 20 21 22 23 RM 1.3 — HYDRAULIC CIRCUIT 1 Flow switch — Cold water …

[Page 10] Unical EVE 05 RTN 24

10 General info fig. 5 EVE 05 RTFS 24 fig. 4 EVE 05 RTN 24 FG RM 1 2 3 4 6 7 5 9 10 11 12 13 14 15 16 17 18 8 1 Gas valve 2 Burner nozzles 3 Ionisation/Ignition electrode 4 Burner 5 Monotermal heat exchanger 6 Flue gas manifold/down-draught diverter …

[Page 11] Unical EVE 05 RTN 24

11 General info fig. 7 EVE 05 CTN 24 EVE 05 CTFS 24 fig. 6 1 3 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 2425 C F GR M C F GR M 1 3 2 4 5 6 7 8 9 10 2526 17 18 19 20 21 22 23 24 11 12 13 14 16 15 1 Flow switch — Cold water filter 2 D.H…

[Page 12] Unical EVE 05 RTN 24

12 General info l/min bar bar l °C °C l bar l l bar bar l/min. l/min. l/min. l/min. l/min. l/min. l/min. °C V-Hz A (F) W IP kg kW kW % % % % n. % % % °C g/s % % mg/kWh % % RTN 24 24 10,17 90,57 89,76 92,60 87,14 2 92,85 90,83 2,38 — 2,28 86,7 14,…

[Page 13] Unical EVE 05 RTN 24

13 Installation info fig.8 2.2.1 — PACKING EVE 05 is delivered completely assembled and packed in a strong cardboard box. Once the boiler has been unpacked check that it is in- tact. 750 430 330 Keep the packaging material (cardboard box, plastic str…

[Page 14] Unical EVE 05 RTN 24

14 Installation info fig. 9 2.2.2 — POSITIONING THE BOILER Every boiler is supplied with special “MOUNT- ING JIG” with which the pipes for connection to the system, D.H.W. and gas can be positioned when the hydraulic system is being laid out and …

[Page 15] Unical EVE 05 RTN 24

15 Installation info 2.2.3 — ASSEMBLING THE BOILER Before connecting the boiler to the D.H.W. and heating system pipes, carefully clean the pi- pes to remove all traces of metal resulting from processing and welding operations as well as any oil and …

[Page 16] Unical EVE 05 RTN 24

16 Installation info fig. 10 2 Ø min. Slope min. 3% Ø 1,5 m min. 2 Ø 1 m max. 1,5 m min. 2 Ø Ø Slope min. 3% 1 m max. 2 Ø min. > 3 Ø > 3 Ø fig. 11 210 Ø 130 180 Direct emission into the atmosphere Natural draught boilers can discharge …

[Page 17] Unical EVE 05 RTN 24

17 Installation info 2.2.6 — SMOKE DISCARGE AND AIR SUCTION DUCT CONFIGURATION C12, C32, C42, C52, C62, C82 — B22 type C12 type C32 type C52 type C82 type C62 type C42 SEPARATE type B22 C12 Boiler designed for connection to hori- zontal exhaust and s…

[Page 18] Unical EVE 05 RTN 24

18 Installation info fig. 12 Pursuant to the directives of regulations in force, discharge of forced draught boilers can 2.2.7 — POSITIONING OF TERMINALS FOR TYPE ‘’C’’ BOILERS either take place through the roof or directly outwards the room …

[Page 19] Unical EVE 05 RTN 24

19 Installation info fig. 13 fig. 14 Diaphragm Ø 42 mm Fitting of the diaphragm Ø 42 2.2.8 — SMOKE EVACUATION Ø 80 WITH AIR SUCTION FLANGE — Type B22 (see par. 2.2.6) Note: For evacuation system with 80 mm dia. and a lenght between 0.5 m and 4 m…

[Page 20] Unical EVE 05 RTN 24

20 Installation info fig. 15 fig. 16 Ø 80/125 Ø 80/125 Ø 60/100 Ø 80/125 Rubber foam gasket Up to 2 m Up to 1 m Up to 2,5 m Rubber foam gasket Diaphragm Ø 42 Diaphragm Ø 42 2.2.9 — DISCHARGE OF FLUE GAS INTO COAXIAL DUCTS Ø 100/60 mm Type…

[Page 21] Unical EVE 05 RTN 24

21 Installation info fig. 17 152 100 95 Up to ΔΔ ΔΔ Δ P = 20 Pa Rubber foam gasket Diaphragm Ø 42 fig. 18 It is not allowed to position the 2 termi- nals in opposite walls, see configuration type C52. DIMENSIONS FOR CONNECTION TO COAXIAL FLUE …

[Page 22] Unical EVE 05 RTN 24

22 Installation info fig. 19 fig. 20 DIMENSIONS FOR CONNECTION THE AIR INTAKE AND THE FLUE GAS DISCHARGE WITH DUAL DUCTS _ > 500 Hmin. = 150 mm CONFIGURATIONS FOR SEPARATE PIPES (SUCTION AND OUTLET) Ø 80 Example N.1 Primary air suction from peri…

[Page 23] Unical EVE 05 RTN 24

23 Installation info fig. 22 fig. 21 135 45 C 2 1 250 min. Example of check using wide radius bends: — 17 mt duct Ø 80 x 2 = 34 Pa — 2×90° Ø 80 long radius bends 2×4 = 8 Pa — horizontal Ø 80 air inlet terminal = 3 Pa — horizontal Ø 80 termina…

[Page 24] Unical EVE 05 RTN 24

24 Installation info 2.2.13 — HYDRAULIC CONNECTION Before installing the boiler we recommend that the system be cleaned to remove any impuri- ties which could originate from components and which could risk damaging the circulating pump and heat excha…

[Page 25] Unical EVE 05 RTN 24

25 Installation info fig. 23 EVE 05 RTN 24 — EVE 05 RTFS 24 EVE 05 CTN 24 F — EVE 05 CTFS 24 F EVE 05 CTN 24 — EVE 05 CTFS 24 6,2 6,0 5,8 5,6 5,4 5,2 5,0 4,8 4,6 4,4 4,2 4,0 3,8 3,6 3,4 3,2 3,0 2,8 2,6 2,4 2,2 2,0 1,8 1,6 1,4 1,2 1,0 0,8 0,6 0,4 0,2 …

[Page 26] Unical EVE 05 RTN 24

26 Installation info 2.2.14 — ELECTICAL CONNECTIONS The electrical connections of EVE 05 are shown in the clause ‘’WIRING DIAGRAMS’’ (par. 2.3 — pag. 29) The boiler must be connected to the mains supply at 230 V — 50 Hz. This connection is t…

[Page 27] Unical EVE 05 RTN 24

27 Installation info 2.3 WIRING DIAGRAM 2.3.1 ACTUAL WIRING DIAGRAM fig. 25 LEGENDA A1…A8 = Connectors TA = Room thermostat (optional) VG = Gas valve RIV/AC = Ignition/Ionisation electrode V = Fan (only for TFS) PV = Fan pressure switch (only for …

[Page 28] Unical EVE 05 RTN 24

28 Installation info Example: At 25°C, the nominal resistance is 10067 Ohm At 90°C, the nominal resistance is 920 Ohm Relation between the temperature (°C) and nominal resistance (Ohm) of the heating sensor SR and D.H.W. sensor SS TABLE OF RES…

[Page 29] Unical EVE 05 RTN 24

29 Adjustment info °C °C Outlet pressure test nipple fig. 27 2.6 — ADJUSTING THE BURNER All the instructions below are for the exclusive use of qualified technicians. All the boilers leave the factory calibrated and tested. If it is necessary to c…

[Page 30] Unical EVE 05 RTN 24

30 Adjustment info fig. 30 1 EVE 05 CTN 24 F — EVE 05 CTN 24 — EVE 05 RTN 24 Tipe of gas Output min. — max (kW) Input min. — max (kW) Supply pressure (mbar) No. of Nozzles Ø Diaphragme (mm) Natural gas(G20) Propan (G31) 10,17 — 24,0 10,17 — 24,0 …

[Page 31] Unical EVE 05 RTN 24

31 Service info 2.8 FAILURE CODES In case of failure the burner is automatically deactivated and the symbol on the display is shown. By pushing the reset button the failure blinking code is shown on the display. Each fault is characte…

[Page 32] Unical EVE 05 RTN 24

32 Service info °C 2.10.8 Sanitary sensor (priority 8) Description: Sanitary temperature sensor intervention Possible solution: verify the sensor operation and its own connections 2.10.9 Heating sensor (priority 9) Description: Heating temperature s…

[Page 33] Unical EVE 05 RTN 24

33 Service info fig. 34 EVE 05 CTN 24 F — EVE 05 CTN 24 F- EVE 05 CTFS 24 F — EVE 05 CTFS 24 EVE 05 RTN 24 — EVE 05 RTFS 24 A = Manometer B = Summer / Winter switch + C.H. tempe- rature control C = D.H.W. temperature control (only for combi C versio…

[Page 34] Unical EVE 05 RTN 24

34 Service info Reset push button In order to restart the boiler when the lockout symbol is displayed, it will be necessary to push this button. Chimney sweeper button This push button, depressed for 3 seconds, activates the chimney sweeper function:…

[Page 35] Unical EVE 05 RTN 24

35 Maintenance info The boiler is fitted with an anti-freeze system which is automatically activated when the tem- perature of the boiler water drops below 6°C: the burner is automatically switched on and the pump started until the temperature of th…

[Page 36] Unical EVE 05 RTN 24

AG S.P.A. 46033 casteldario — mantova — italia — tel. 0376/57001 (r.a.) — telefax 0376/660556 The Unical declines every responsibility for the possible inaccuracies if owed to errors of transcript or press. Also reserves the right to bring those c…

Понравилась статья? Поделить с друзьями:
  • Аркоксиа инструкция по применению цена аналоги уколы взрослым
  • Залог успеха руководство
  • Виферон для взрослых свечи отзывы цена инструкция
  • Немозол таблетки для детей инструкция как принимать
  • Должностная инструкция заведующий столовой в колледже